Home | Careers | FAQ | Contact Us | Sitemap | Help | Emergency | عربي
fewa.gov.ae official website of the Federal Electricity & Water Authority fewa.gov.ae official website of the Federal Electricity & Water Authority
HomeTenders & AuctionsMaterial Pre-Qualification
Home Print Email Contact Us Increase Font/Decrease Font Decrease Font Increase Font Increase Font
BillInquiry
Please enter your consumer number
HSE
Kiosk Machine Locations
Suggestions & Complaints
Photo Gallery
Material Pre-Qualification
General Instructions :
  1. Only registered vendors can apply for material pre-qualification.

  2. For registration, please click here

  3. Pre-qualification is applicable only for the major materials listed below, as per the concerned sectors/departments.

  4. Fill the PQ Application Form, and present it duly signed and stamped along with your submittal, as per the listed requirement, to the Department of Purchases, Contracts & Stores (FEWA Head Office, Dubai) [Kindly check the attachments at the bottom].

  5. Mention the specific material description from the below list, on the application form.

MAJOR MATERIALS UNDER ELECTRICITY SECTOR
S. No. Description
1 Switchgears
2 Cables
3 Joints & Terminations
4 Steel Wooden Pole
5 Conductors
6 Disc / Pin Insulator
7 Capacitor Bank
8 Earthing Assembly
9 Lightning Arrestor & Drop Out Fuse
10 Transformers ( Power & Distribution )
11 Battery & Battery Charge
12 Ring Main Units
13 Feeder & Service Pillars & Fuse Box & GRP Enclosures
14 Electronic Meter, Metering Cabinet, LVC.B
15 11 kV Metering Units
16 kV & L.V. Fuses
17 Surge arrestor
18 RTU & MUX
19 Fiber Optic
MAJOR MATERIALS UNDER WATER SECTOR
S. No. Description
1 All types of Valves with their Accessories
2 All types of Water Meters with their Accessories
3 All types of Pipes (Material) with their Fitting & accessories
4 All types of Pumps
5 All types of Compressors with their equipments
6 All Types of Surge Vessels
7 All Types of Tanks (GRP, Carbon Steel ..etc.)
8 All components of Gas Chlorination system
9 All components of Fire Detection & Protection system
10 All types of Motors with their Accessories
11 All types of Transformers
12 All types of Switch Gears
13 All types of Cables "Power Cables & Control Cables"
14 Medium Voltage Variable Frequency Drives (MV - VFD)
15 DC & UPS System
16 PLC (Control System)
17 Fiber Optic Cables
18 All Pressure & Level Instruments (Electronic)
19 All Types of Gauges (Level, Pressure gauges ...etc.)
20 All types of Analyzers (PH Analyzer, Conductivity Analyzer & Chlorine Analyzer)
21 Industrial PCs
22 Air Conditioning System
23 All Types of Crane
24 Pre-cast Concrete Elements
25 Pre-Engineered Building System
26 Hot Rolled Building Structures
Application For Material Pre-Qualilfication
Requirement list for Materials under Electricity Sector
Requirement list for Materials under Water Sector

Consumption Slabs
Energy Calculator
USEFUL LINKS
Contact Center 800 FEWA (3392)
Send feedback to cs@fewa.gov.ae
Accessibility | Privacy Policy | Terms & Conditions | Disclaimer | Sitemap | Contact Us
Copyright © Federal Electricity & Water Authority. All Rights Reserved.
Page last updated on December 12, 2012 at 06:58
Supports Microsoft Internet Explorer 6.0+, Firefox 2.0+, Opera 9.0+, Google Chrome 26.0.1410 and Safari 5.1.7
This site is best viewed in 1024 x 768 screen resolution or higher
Sharing & Resources
twitterfacebook
Acrobat Reader Flash Windows Media Player Microsoft Office